Classic Heavy Industry Group Co.,Ltd gjyw@jdjt.com 86-537-3888882
Classic Heavy Industry Group Co.,Ltd company profile
Products
Home > Products > Steel Structure Workshop > GB/CE/AISC Design Standards Prefab Steel Building with 560,000 Tons Annual Production Capacity and Corrosion Resistant Steel Structure Workshop

GB/CE/AISC Design Standards Prefab Steel Building with 560,000 Tons Annual Production Capacity and Corrosion Resistant Steel Structure Workshop

Product Details

Place of Origin: China-Shandong

Brand Name: CLASSIC GROUP(CHINA)

Certification: GB/CE-EN1090/ISO3834

Model Number: JD-GJG131

Document: 2026L-CLASSIC GROUP Company...le.pdf

Payment & Shipping Terms

Minimum Order Quantity: 718 square meters

Price: $41-51 Square Meters

Packaging Details: Professional Packaging Solutions

Delivery Time: 25-50

Payment Terms: L/C,D/A,D/P,T/T,Western Union

Supply Ability: 390,000 tons/year

Get Best Price
Chat Now
Product Details
Highlight:
Design Capabilities:
GB/CE/AISC
Maximum Annual Production Capacity:
560000/Tons
Packaging Method:
Execute Customer Requirements
Serving Country Quantity:
60+
Design Capabilities:
GB/CE/AISC
Maximum Annual Production Capacity:
560000/Tons
Packaging Method:
Execute Customer Requirements
Serving Country Quantity:
60+
Product Description

Steel Structure Workshop

Designed and manufactured in accordance with international industrial building standards, our steel structure workshop warehouse is suitable for various industrial scenarios including manufacturing processing, logistics warehousing, factory parks and temporary industrial projects. With adjustable structural solutions for different climates, terrains and regional building codes, it can adapt to coastal humid areas, cold snow regions, high-temperature arid areas and other complex global environments. The standardized export packaging and complete supporting accessories ensure convenient global transportation, installation and after-sales service.


GB/CE/AISC Design Standards Prefab Steel Building with 560,000 Tons Annual Production Capacity and Corrosion Resistant Steel Structure Workshop 0

Technical Specifications

Component Detailed Specifications
Primary Frame Welded H-section Steel / Hot-rolled Steel (Q235/Q355/S235/S275/S355)
Surface Treatment Painted or galvanized
Roof & Wall Panels Sandwich Panels (Rock Wool/PU/EPS) or Single Corrugated Steel Sheets
Design Standards GB/CE/AISC

Why Choose Us?

  • Exceptional Durability: Our high-tensile steel frames are resistant to termites, fire, and corrosion.
  • Rapid Deployment: Modular design allows for 30-50% faster installation.
  • Custom Engineering: Tailored CAD/Tekla designs to optimize material usage.
  • Eco-Friendly: Over 90% of materials are fully recyclable.

Primary Applications

  • Industrial: Logistics warehouses and manufacturing plants.
  • Commercial: Shopping malls and automobile showrooms.
  • Agricultural: Large-span poultry houses and grain storage.

Frequently Asked Questions (FAQ)

Q1: How long does it take to deliver a steel structure building?

A: Generally, the production cycle is 30-45 days after the design is finalized. Shipping time depends on the destination port, typically ranging from 15 to 40 days.

Q2: Can your steel buildings be customized to specific local building codes?

A: Yes, our engineering team can design the structure to meet specific local wind speeds, snow loads, and seismic requirements according to international standards.

Q3: What maintenance is required for a steel structure?

A: Steel buildings require very low maintenance. Periodic inspections of the paint or galvanized coating and clearing of roof gutters are usually sufficient to ensure a lifespan of over 50 years.

Ratings & Review

Overall Rating

5.0
Based on 50 reviews for this supplier

Rating Snapshot

The following is the distribution of all ratings
5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 stars
0%

All Reviews

M
Mia
Fiji May 7.2026
A massive steel structure production base!
M
Michael
Brazil Mar 20.2026
Great team! Looking forward to the next collaboration.
C
Christopher
Bulgaria Nov 30.2025
You guys were great, this project was completed very well!