Product Details
Place of Origin: Shandong, China
Brand Name: CHINA CLASSIC GROUP
Certification: AISC/GB/CPA
Model Number: JD-GJG115
Document: 2025--CLASSIC GROUP Company...le.pdf
Payment & Shipping Terms
Minimum Order Quantity: 1155 Square Meters
Price: $30-49 Square Meters
Packaging Details: Packing Strictly According to Customer Requirement
Delivery Time: 18-25 Days
Payment Terms: MoneyGram,Western Union,T/T,D/P,L/C,D/A
Supply Ability: 482200 Tons/Year
Building Type: |
Prefab Workshop |
Building Structure Type: |
Light Steel |
Design Capabilitie: |
Yes |
Raw Material Standard: |
S235/S355/A36/A992/A572(Specific Types Should Be Executed According To The Drawing Requirements) |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Exterior Wall Panel: |
Drawing Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
482200 Tons |
Third-party Inspectionion: |
SGS, TUV, Etc. |
Building Type: |
Prefab Workshop |
Building Structure Type: |
Light Steel |
Design Capabilitie: |
Yes |
Raw Material Standard: |
S235/S355/A36/A992/A572(Specific Types Should Be Executed According To The Drawing Requirements) |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Exterior Wall Panel: |
Drawing Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
482200 Tons |
Third-party Inspectionion: |
SGS, TUV, Etc. |
Durable Galvanized Prefab Steel Structure Workshop Warehouse For Machinery Manufacturing
Prefab steel structure workshop warehouse stand out in the construction industry for their unmatched construction efficiency and cost-effectiveness, two advantages that directly address the core demands of industrial and manufacturing projects.
Unlike traditional concrete or brick workshops that require on-site pouring, formwork installation, and long curing periods, prefabricated steel components are produced in standardized factories with precise machinery and strict quality control.
This off-site fabrication minimizes on-site construction time by up to 50% in many cases, as components can be transported to the site and assembled immediately once the foundation is ready.
From a cost perspective, factory mass production reduces material waste—steel’s high recyclability also cuts down on raw material costs—and the shortened construction timeline lowers labor expenses and accelerates the workshop’s time-to-operation, allowing businesses to start production or storage activities sooner and generate returns faster.
Additionally, the lightweight nature of steel structures reduces the complexity of foundation design, further trimming overall project costs without compromising structural stability.
![]()
![]()
Overall Rating
Rating Snapshot
The following is the distribution of all ratingsAll Reviews