Product Details
Place of Origin: China (Shandong)
Brand Name: CHINA CLASSIC
Certification: CE, AISC, CIDB
Model Number: JD-GJG063
Document: 2025--CLASSIC GROUP Company...le.pdf
Payment & Shipping Terms
Minimum Order Quantity: 22 Tons
Price: $900-1000 Tons
Packaging Details: Bulk carriers
Delivery Time: 55-65 Days
Payment Terms: MoneyGram,Western Union,T/T,D/P,L/C,D/A
Supply Ability: 398700 Tons/Years
Building Type: |
Bridge Building |
Service Life: |
Subject To The Drawings |
Raw Material Standard: |
Q420/Q460/Q550/Q690(Special Strength) Etc. |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Galvanization: |
According To Design Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
398700 Tons |
Third-party Inspectionion: |
SGS, BV Etc. |
Component Type:: |
Mostly Irregularly Shaped Components |
Structural Form: |
Heavy |
Surface Treatment: |
Galvanization & Spray Paint |
Building Type: |
Bridge Building |
Service Life: |
Subject To The Drawings |
Raw Material Standard: |
Q420/Q460/Q550/Q690(Special Strength) Etc. |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Galvanization: |
According To Design Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
398700 Tons |
Third-party Inspectionion: |
SGS, BV Etc. |
Component Type:: |
Mostly Irregularly Shaped Components |
Structural Form: |
Heavy |
Surface Treatment: |
Galvanization & Spray Paint |
Prefab Quick-Assembly Steel Structure Bridge For Emergency Infrastructure Renovation.
Steel structure bridges offer a compelling blend of environmental responsibility and long-term financial value, aligning with green infrastructure goals.
Steel is 100% recyclable without loss of structural integrity, and over 90% of structural steel used in bridge projects comes from recycled materials—slashing the carbon footprint by 70% compared to concrete bridges (which rely on carbon-intensive cement production).
At the end of a bridge’s 75+ year service life, steel components can be disassembled and reused or recycled, offsetting demolition costs and diverting waste from landfills.
Furthermore, steel’s resistance to corrosion (when treated with galvanization or epoxy coatings) reduces maintenance costs by 30–40% over concrete bridges, which often require frequent repairs for cracking, spalling, and rebar rust.
The recyclability and low upkeep make steel bridges a cost-effective, eco-friendly choice for long-term infrastructure investments.
![]()
![]()
CLASSIC GROUP:
1. A super factory covering 560,000 square meters.
2. Extensive experience in large-scale bridge projects.
3. Equipped with advanced ultra-large steel structure production lines.
4. Winner of multiple top awards in China's steel structure industry.
5. Participating in project construction in more than 50 countries around the world
![]()
Overall Rating
Rating Snapshot
The following is the distribution of all ratingsAll Reviews