Product Details
Place of Origin: China
Brand Name: CLASSIC GROUP
Certification: CE, AISC
Model Number: JD-GJG062
Document: 2025--CLASSIC GROUP Company...le.pdf
Payment & Shipping Terms
Minimum Order Quantity: 22 Tons
Price: $900-1000 Tons
Packaging Details: Bulk carriers
Delivery Time: 55-65 Days
Payment Terms: MoneyGram,Western Union,T/T,D/P,L/C,D/A
Supply Ability: 398700 Tons/Years
Building Type: |
Bridge Building |
Service Life: |
Subject To The Drawings |
Raw Material Standard: |
Q420/Q460/Q550/Q690(Special Strength) Etc. |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Galvanization: |
According To Design Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
398700 Tons |
Third-party Inspectionion: |
SGS, BV Etc. |
Component Type:: |
Mostly Irregularly Shaped Components |
Structural Form: |
Heavy |
Surface Treatment: |
Galvanization & Spray Paint |
Building Type: |
Bridge Building |
Service Life: |
Subject To The Drawings |
Raw Material Standard: |
Q420/Q460/Q550/Q690(Special Strength) Etc. |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Galvanization: |
According To Design Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
398700 Tons |
Third-party Inspectionion: |
SGS, BV Etc. |
Component Type:: |
Mostly Irregularly Shaped Components |
Structural Form: |
Heavy |
Surface Treatment: |
Galvanization & Spray Paint |
Durable Corrosion-Resistant Steel Structure Bridge, Low Cost And Fast Construction.
Steel structure bridges deliver fast, efficient construction that minimizes downtime for busy transportation corridors, merging prefabrication benefits with on-site flexibility.
Most steel bridge components (girders, trusses, deck panels) are precision-manufactured in off-site factories, adhering to strict quality standards and reducing on-site labor by 40–50% compared to concrete bridges.
These prefabricated parts can be transported to the site and assembled via bolted or welded connections, eliminating the lengthy curing periods (up to 28 days per concrete segment) that delay concrete bridge projects.
For urban areas with heavy traffic, this accelerated timeline means lane closures and detours are cut from months to weeks, reducing commuter delays and business disruptions. The modular design also allows for phased construction, enabling partial bridge operation while upgrades or expansions are underway.
![]()
![]()
CLASSIC GROUP:
1. A super factory covering 560,000 square meters.
2. Extensive experience in large-scale bridge projects.
3. Equipped with advanced ultra-large steel structure production lines.
4. Winner of multiple top awards in China's steel structure industry.
![]()
Overall Rating
Rating Snapshot
The following is the distribution of all ratingsAll Reviews