Product Details
Place of Origin: China
Brand Name: CHINA CLASSIC STEEL STRUCTURE
Certification: CE, ISO, CIDB, AISC, etc.
Model Number: JD-GJG127
Document: 2025--CLASSIC GROUP Company...le.pdf
Payment & Shipping Terms
Minimum Order Quantity: 2760 Square Meters
Price: $49-59 Square Meters
Packaging Details: Execute the optimal packaging scheme.
Delivery Time: 35-39 Days(Execute project requirements)
Payment Terms: MoneyGram,Western Union,T/T,D/P,D/A
Supply Ability: 469520 Tons/Year
Building Type: |
Shopping Mall Building |
Steel Material:: |
Q235B/Q355B/S235JR/S275JR/S355JR |
Building Structure Type: |
Multi-story Steel Structure Building |
Design Capabilitie: |
Yes |
Raw Material Standard: |
European Standard Steel |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Exterior Wall Panel: |
Drawing Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
469520 Tons |
Third-party Inspectionion: |
Internationally Renowned Third-party Testing Organizations(CNAS, SGS, Etc.) |
Service Life: |
45-60 Years |
Building Type: |
Shopping Mall Building |
Steel Material:: |
Q235B/Q355B/S235JR/S275JR/S355JR |
Building Structure Type: |
Multi-story Steel Structure Building |
Design Capabilitie: |
Yes |
Raw Material Standard: |
European Standard Steel |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Exterior Wall Panel: |
Drawing Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
469520 Tons |
Third-party Inspectionion: |
Internationally Renowned Third-party Testing Organizations(CNAS, SGS, Etc.) |
Service Life: |
45-60 Years |
Eco-Friendly Green-Certified Building Prefab Steel Structure Commercial Shopping Mall.
Steel structure shopping mall building leverage prefabricated components to cut construction timelines by 40–50% compared to concrete counterparts, directly boosting developers’ return on investment.
Most steel frames, roof trusses, and floor decks are manufactured off-site with CNC precision, eliminating on-site concrete curing (which can take 28+ days per slab) and reducing on-site labor requirements by 35%.
This accelerated build process allows malls to open 6–12 months ahead of schedule, enabling retailers to start generating sales sooner and developers to recoup capital faster.
For urban projects in competitive markets, the ability to launch before neighboring developments also secures prime tenants (such as luxury brands or anchor supermarkets) and builds early brand loyalty among local shoppers, while minimizing holding costs like construction loans and property taxes.
![]()
CLASSIC GROUP:
Globally renowned steel structure manufacturer, a leading steel structure enterprise in China, and an expert in steel structure construction, serving more than 50 countries worldwide.
![]()
Overall Rating
Rating Snapshot
The following is the distribution of all ratingsAll Reviews