Product Details
Place of Origin: Shandong Province, China
Brand Name: CLASSIC STEEL STRUCTURE
Certification: AISC/GB/CE
Model Number: JD-GJG097
Document: 2025--CLASSIC GROUP Company...le.pdf
Payment & Shipping Terms
Minimum Order Quantity: 745 Square Meters
Price: $34-53 Square Meters
Packaging Details: Packing Strictly According to Customer Requirement
Delivery Time: 21-32 Days
Payment Terms: MoneyGram,Western Union,T/T,D/P,D/A
Supply Ability: 529900 Tons/Year
Building Type: |
Industrial Building |
Service Life: |
55-70 Years |
Design Capabilitie: |
Yes |
Raw Material Standard: |
Q235B/Q355B/Q235JR/Q355JR((Execute The Drawing Design)) |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Exterior Wall Panel: |
Sandwich Panel(Rock Wool), Color Steel Plate, Etc. |
Galvanization: |
According To Design Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
529900 Tons |
Third-party Inspectionion: |
SGS, TUV. |
Building Type: |
Industrial Building |
Service Life: |
55-70 Years |
Design Capabilitie: |
Yes |
Raw Material Standard: |
Q235B/Q355B/Q235JR/Q355JR((Execute The Drawing Design)) |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
Exterior Wall Panel: |
Sandwich Panel(Rock Wool), Color Steel Plate, Etc. |
Galvanization: |
According To Design Requirement |
Construction Service: |
Engineer Guidance Installation |
Annual Production Capacity: |
529900 Tons |
Third-party Inspectionion: |
SGS, TUV. |
Modern Steel Structure Workshop for Optimal Industrial Building Functionality.
Steel structure industrial building Workshop Warehouse stand out for their exceptional cost-efficiency and rapid construction timeline, making them a top choice for industrial operators aiming to minimize project downtime and budget overruns.
The prefabricated nature of steel components means most parts are manufactured off-site in controlled factory settings, eliminating on-site fabrication delays and reducing material waste by up to 90% compared to traditional concrete structures. This off-site production also ensures precise dimensional accuracy, cutting down on rework costs and labor hours during on-site assembly.
Additionally, steel’s high strength-to-weight ratio allows for lighter foundation designs, further lowering foundational construction expenses. On average, steel industrial buildings can be erected 30–50% faster than concrete alternatives, enabling businesses to move into production or operations ahead of schedule and accelerate their return on investment.
![]()
Overall Rating
Rating Snapshot
The following is the distribution of all ratingsAll Reviews